Today: November 18, 2024
August 11, 2022
1 min read

The Antonio Guiteras thermoelectric plant leaves the system

La Guiteras, Matanzas. Foto: ACN.

As a result of contamination and the decrease in the flow of raw water after valve manipulation operations at the Matanzas supertanker base, the Antonio Guiteras power plant interrupted electricity generation this afternoon.

According to specialists, the water level was insufficient to adjust the demineralization treatment to the demands of the industry, which required around 60 cubic meters per hour.

https://www.youtube.com/watch?v=Q6HL_PAQasI

The technicians of the Electrical Union and Energy and Mines evaluate the possibility that a leak has been registered in the water walls of the boiler, a consequence of having received fluid contaminated with salt water.

Everything seems to indicate that it is necessary to allocate at least a prudent period of time to evaluate and repair possible damage to the boiler, and restore the volume of water and its quality.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Adjustments in 44% of the first circle of the President
Previous Story

Today or tomorrow the rescuers will be able to enter the mine: López Obrador

The plan for older adults in search of guaranteeing them a dignified life
Next Story

What is the proposal of the tax reform for pensions

Latest from Blog

Go toTop